Having outgrown our old space, we
have completed a new and exciting project to serve the present and
future needs of the church and the local area
(see photos lower down of actual construction).
|
|
Building Facilities |
|
Serving the Community |
|
Funding |
This is the building we used for 20 years for all our church meetings.
| Work begins |
Taken
shortly after the builders came on site
Their portakabins are at the far end of the field
Excavating
the bank to make room for re-routing the roadway
Clearing the topsoil off the site

Checking the levels
Steelwork being delivered
The site stoned and rollered
Site markings
The builders had to work carefully round these pipes, which take services
to our other buildings.
Foundations for the prayer room.
Concrete foundations in place – note the bolts for one
of the steel pillars at bottom left
Steelwork
going up on Tuesday 6th March
This will be the kitchen area at ground level with first floor above
A very big crane!
A closer look at the steelwork
The first section of the steelwork is completed
Friday 9th March – the whole of the outer shell is up!
Another
view of the steel frame – foundations of the prayer room are on the
left
The
view from the foyer, looking into the main hall.
The stage area will be at the far end.
Founding
Pastor Peter Whiteside, Clerk of Works Geoff Chetwood and Senior
Minister Carl Gidney celebrate the completion of the steel framework.

Mid-May and the brickwork is now well under way.

This
is the first floor above the foyer area,
looking towards
our existing building.

One of the sets of stairs is now in place.

Taken
from the first floor looking along the main
hall.
The stage will be at the far end.
The
walkways around the edge are for the bricklayers
who are working at first floor level.

Here are the outer walls, now up to first floor level.

Looking towards the main hall from above the foyer area, work has commenced on fitting the inner roofing panels.

Fitting the inner roof panels above the first floor rooms

A view from outside showing the inner roof panels almost completed.

Roof panels going into place.
The main hall.
The pathway taking shape.
Decorating
Reception
The front entrance